| No |
Project Description |
|
| 1 |
Building and SMCC premises clean up around the building including rubbish removal, removal of concrete base for defunct garden shed and path leading to it |
|
| 2 |
Building of new rain-water drainage with a soak pit |
|
| 3 |
Construction of new entrance to the main car park from Vardon Road, and construction of new ramp connecting the main car park to the mosque grounds |
|
| 4 |
Installation of main entrance gate for SMCC premises |
|
| 5 |
Landscaping of the Mosque gardens with fresh top soil and grass seeds. |
|
| 6 |
SMCC building repairs including several roof leaks |
|
| 7 |
Central Heating system cleanup and repair |
|
| 8 |
All windows and main entrance washed and cleaned |
|
| 9 |
Cleaning up and leveling of Main Car Park |
|
| 10 |
Complete fresh paint inside the building, including all woodwork |
|
| 11 |
Installation of new Closed Circuit TV Security System |
|
| 12 |
Replacing all ceiling lights, including dome halogen lights |
|
| 13 |
Replacing all stained and damaged ceiling tiles |
|
| 14 |
Dome, roof and guttering washed and cleaned |
|
| 15 |
Car Park surfacing and tarmacing and block paving of the forecourt |
|